Templates Download
Design Record
π PART SUBMISSION WARRANT
Is part number and drawing revision number matching with the drawing?
Are all fields on PSW filled out correctly? Information not applicable to any specific part must be identified as “NA”.
Is any exception to manufacturing process or PPAP run noted on PSW?
Is there action plan included to address any exception to drawing and process requirements?
IMDS number must be included, showing the latest revision submitted to the Material Data System, MPT plant specific ID#.
Does PSW specify molds/cavities/production process pertaining to the PPAP?
Has supplier noted production rate on PSW at which the PPAP samples were produced during significant production run?
Are checking aids used in the everyday processing of a part identified on the PSW?
Is reason for submission clearly identified and confirmed?
Does the PPAP level conform to what is required by the Purchase Order?
Is part weight expressed in kilograms to four significant decimal places (0.0000)?